Load shedding is detrimental to progress wherever and whenever it is applied. Switching off power to key areas to reduce demand for energy is an inconvenience that can be avoided by hiring interim power plants to support existing power grids or at the site itself (factories and etc.). This allows day to day activities in the business and urban sectors to continue.

A load shedding can be avoided by hiring an interim power plant either from the utility provider’s power grid or directly from the consumer’s business sites.

Load shedding is a necessary, though inconvenient, procedure where electricity is shut down to avoid overloading the system, which results in a total blackout. This usually happens when the demand for electricity goes beyond the ability of the system to supply it. These blackouts generally occur locally, but may even spread to large areas such as a whole country or even continents. There are two causes for blackouts: Lack of generation volume, and deficient infrastructure to distribute enough power to the locale where it is needed.

Load shedding happens normally in countries where the energy distribution is hampered by poor and inadequate infrastructure. The opposite happens in advanced countries due to well-managed systems and adequate infrastructure.

All in all, load shedding has the capability to incapacitate the daily activities of a country. The negative effects are numerous and may lead to economic instability.

Load shedding (also known as loadshedding, rolling blackout, brownout, electricity interruption), is commonly utilized in industrial, large commercial, and utility operations. While waiting for the permanent solution, the quickest way to end load shedding is to hire a temporary power plant.